John Hart Dam Seismic Upgrade Project
Project Timeline
About The Project
Day to day BC Hydro’s dams, like the John Hart Dam, are safe and functioning normally.
Vancouver Island is within the most seismically active zone in BC. For many decades we have been assessing earthquake hazards at our dams, related facilities, and upgrading the dams as required. In 2007, we launched a six-year, $10 million ‘Probabilistic Seismic Hazard Analysis’ study with the results released in 2014. The purpose for this investment? To create a best-in-class model for calculating earthquake hazards for BC, with the results used to better evaluate dam assessments and validate the resulting upgrades. The study outcome was that significant capital upgrades would be required.
Project objectives:
- Upgrade the earthfill and concrete dam to improve seismic performance, including:
- Placing upstream and downstream earthfill berms.
- Adding a seepage cutoff wall (impermeable wall) where required within the earthfill sections to act as the seepage barrier.
- Anchoring of the concrete dam structures.
- Upgrading the concrete roadway.
- Construct permanent flood and flow imbalance risk mitigation upgrades including:
- Adding an overflow spillway below the road deck.
- Replacing the three spillway gates and related works, such as the hoist system, so they can safely and more reliably pass water in a controlled manner downstream post-earthquake.
- Install new equipment and upgrades to the existing protection and control equipment to meet current reliability standards, including improved post-earthquake operation.
Construction Reports
- #1: Early Site Works – September-December 2022
- #2: Early Site Works – January-February 2023
- #3: Early Site Works – March-April 2023
- #4: Early Site Works Transitioning To Project Construction – May-June 2023
- #5: John Hart Dam Project Construction Report – July-August 2023
- #6: John Hart Dam Project Construction Report – September-October 2023
- #7: John Hart Dam Project Construction Report – November-December 2023
- #8 – John Hart Dam Project Construction Report – January-February 2024
- #9 – John Hart Dam Project Construction Report – March-April 2024
- #10 – John Hart Dam Project Construction Report – May-June 2024
- #11 – John Hart Dam Project Construction Report July-August 2024
Project Video
Watch the latest project video below or at these links on Vimeo
Latest News
Sep 04, 2024
The July to August report covers off the project’s status, project activities, and a people profile.
See All News UpdatesSee All News
- Next phase of John Hart Dam work to temporarily close trail access to Dolphin Pool area
- BC Hydro posts John Hart Dam Seismic Upgrade Project construction report #10
- BC Hydro Releases A New Video Update for the John Hart Dam Seismic Upgrade Project – copy
- Water seepage barrier completion marks milestone in John Hart Dam project
- BC Hydro posts John Hart Dam Seismic Upgrade Project construction report #9