JHGS – Construction Update #07 – November 2013
November 30, 2013
In mid-November, BC Hydro announced SNC-Lavalin Inc. was selected as the preferred contractor to design and build the replacement project. BC Hydro and SNC-Lavalin are working to sign the project contract in mid-February 2014, when they would then mobilise to the site.
Download the report: JHGSRPConstRpt-Nov2013