JHGS Construction Update #32 February 2016

February 20, 2016

  • Project Status
  • Excavation Status – Powerhouse Area
  • Construction Pictures – John Hart Dam Area – Cofferdam Area – Downstream Work – Surge Tank Area – Area Below John Hart Dam – Downstream of John Hart Dam – Powerhouse Cavern – Main Access Tunnel – Tailrace
  • Powerhouse Crane
  • Design Image – John Hart Water Intake
  • Environment Update
  • BC Hydro Project Board Site Tour
  • A Look Back In Time
  • People Profile – Brian Knoke
  • Construction – Point Of Interest