Supplier Sign In

JUNE 2017 COMMUNITY CONSTRUCTION UPDATE REPORT #48

  • Project Status
  • Project Schedule
  • Construction Pictures – John Hart Dam – Low Level outlet – Power Tunnel Breakthrough – Power Tunnel Manifold – Powerhouse – Turbine Stator – Surge Chamber
  • Environment
  • Power Cable Tray From Powerhouse To Substation
  • People Profile – Mariah Grace
  • Construction – Point Of Interest

Read or download the complete report here.